Friday, November 18, 2016

The Kitchen is Finally Completed.


Finally a New Kitchen

                            After several years of working on this home, on weekends, 

                            We have completely rebuilt the kitchen with new cabinets, 

                            wiring, and plumbing. 


The picture of the North East Walls.


The Double Thermador Oven on the West Wall

The Electric Stove Top with Electric Oven on the North Wall

Picture sowing the South Wall on the Left with a view to the Pool. 

The 4 seat Island

A view back to the North Wall standing in front of the Frig.

Back the opposite View as the above picture.  Looking at the Doorway to the East Breakfast Room, 

Cabinets on the South Wall.  A Basket Drawer Setup.

Again, the Middle Island 

View looking at the Stove Top with Range Hood. 

No comments:

Post a Comment